Built in the factory. Prepared for the site.
Organized production, repeatable processes and practical quality control help RZ PREFAB deliver modular buildings ready for efficient transport and installation.

From components to completed modular units.
Our manufacturing workflow brings structural fabrication, enclosure, interior preparation and final inspection into a coordinated process.
Depending on the product system and project specification, units can be prepared with doors, windows, insulation, electrical systems, plumbing, interior finishes and supporting facilities before shipment.
Engineering Review
Confirm application, drawings, specifications and production requirements.
Component Production
Prepare structural, enclosure and supporting parts under controlled processes.
Assembly & Fit-out
Coordinate modular assembly, finishes and selected internal systems.
Inspection & Delivery
Check completed work and organize packaging for efficient shipment.
More work completed before the building reaches the site.
- Standardized and repeatable manufacturing processes
- Efficient use of materials and production time
- Reduced on-site work for many product systems
- Flexible configurations for different applications
- Transport planning considered from the beginning